To maintain optimal system performance and prevent potential critical errors caused by prolonged continuous operation, it is recommended to perform a complete system power cycle once per month.

Please follow the steps below:

  1. Shut down all equipment: Plixus central unit and conference devices. If the CoCon meeting management software is in use, also shut down the CoCon PC.
  2. Power on all conference devices first. After 90 seconds, power on the Plixus central unit.
  3. Once all devices and the central unit have fully completed their boot process, power on the CoCon PC.

💡 For smaller systems, all devices may be powered on simultaneously.